Class Code: Description: Rate
0042 Landscape Gardening $3.82
1463 Asphalt Worker $11.11
2576 Awning Mfg. & Shop $1.37
2802 Carpentry Shop Only & Driver $3.06
2883 Cabinet Works $2.41
3030 Iron or Steel Shop $7.37
3040 Iron Wks Structure & Drivers $4.56
3365 Welding or Cutting & Drivers $6.66
3632 Machine Shop NOC $2.28
3724 Millwright Work $4.61
4034 Concrete Mfg. & Drivers $4.18
4130 Glass Merchant $4.16
5020 Ceiling Installation $3.78
5022 Masonry NOC $4.31
5040 Iron/Steel Erection Frame St. $17.78
5057 Iron/Steel Erection NOC $8.15
5059 Iron/Steel Erection $27.19
5102 Door Frame, Sash Erection $4.32
5146 Furniture Install or Fixture $3.46
5183 Plumbing NOC & Drivers $3.05
5188 Automatic Sprinkler Installation. $2.99
5190 Electrical Wiring W/in Build $2.70
5213 Concrete Construction NOC $5.84
5215 Concrete Work-Residence $2.99
5221 Paving or Repave & Drivers $2.95
5222 Concrete Construction Bridge $6.31
5223 Swimming Pool Construction $3.95
5348 Tile Work-Inside $2.86
5403 Carpentry NOC $5.16
5437 Carpentry - Trim, Cabinet Install $4.75
5445 Wallboard Installation $3.29
5462 Glazier Away From Shop & Drivers $4.44
5474 Painting & Paper Hanging & Drivers $5.21
5478 Carpet, Linoleum & Vinyl Floor $3.05
5479 Insulation Work NOC & Drivers $4.04
5480 Plastering NOC & Drivers $4.39
5506 Street/Road Const. Pave/Repaving $6.23
5507 Street/Road Const. Subsurface $4.01
5535 Sheet Metal - Install, Drivers $3.71
5537 HVAC $3.89
5606 Contractor Executive Supervisor $1.46
5645 Carpentry Detached Dwelling $8.56
5651 Carpentry $5.74
5703 Building Raising/Moving $13.80
6003 Pile Driving & Drivers $5.59
6204 Drilling NOC & Drivers $9.05
6217 Excavation NOC & Drivers $4.37
6229 Irrigation/Drainage Systems $3.42
6306 Sewer Construction & Drivers $3.35
6319 Water/Gas Main Construction $3.43
6325 Conduit Construction for Wire $4.86
6400 Fence Erection-Metal $4.63
7605 Burglar Alarm Install $1.67
7611 Telephone or Cable Line Installation $3.40
7613 Telephone, Cable Service Lines Installation $3.84
8010 Store-Hardware $1.28
8227 Contractor Permanent Yard $3.64
8232 Lumberyard - New Material Only $3.20
8742 Outside Salesman $0.24
8810 Clerical $0.12
9014 Building Operation B/Contract $1.88
9015 Building Operations B/Owner $2.16
9501 Painting Shop Only & Drivers $2.33
**This is not a complete list of CCG's Rates. If you don't see your rate listed here please contact us.